Saudi Electricity Company
Tennet
SBB
ÖBB

“As a cable-independent manufacturer of the CONNEX cable connection system, PFISTERER was able to offer us a fast-deploying solution in a very short time.”

Torsten Kröger, operation and service of 110 kV overhead line and cable networks of Schleswig-Holstein Netz AG

PFISTERER hat gezeigt, dass das Unternehmen auch ALS ANBIETER VON KOMPLETT-LÖSUNGEN HÖCHSTE ANFORDERUNGEN ERFÜLLT.

Juan Carlos Sanchez, Canary Islands Project Director von Red Eléctrica de España (REE)

„ALS WELTMARKTFÜHRER IN IHREM BEREICH, haben wir uns für PFISTERER für die 220 kV-AUSSTATTUNG FÜR DEN WINDPARK MORAY FIRTH ENTSCHIEDEN.

Peter Cooke, Technical Development Director, Volkerinfra.

References

Energy transmission
Offshore wind power
Submarine cables
TenneT operates numerous 155 kV and 220 kV AC submarine cable connections in the North Sea. The diversity of cable types and manufacturers requires extensive stocks of specific spare parts and repair…
Energy distribution
Distribution station
Construction of an underground distribution station in a residential neighborhood that needs to be quiet, safe and invisible to meet the aesthetic and functional requirements of the City of Anaheim.
Energy transmission
Overhead lines
In the field of compact cables, ever higher demands are being placed on the stability and safety of insulating crossbars. When constructing a prototype for a 420 kV insulated lifting beam, PFISTERER…
Energy transmission
Underground cables
Substations
The reliable operation of grids on the Canary and Balearic Islands is of central importance to the stable energy supply of both the local population and the tourist centers. However, the isolated…
Wind
TenneT needed a reliable connection between the DolWin alpha and DolWin gamma offshore platforms to ensure the 900 MW feed-in guarantee for more than one million households.