Skip to main content

Realizing
THE FUTURE

In (big) cities and in the countryside, on the coast and at sea, in this country and around the world - in numerous successful projects, innovative products and reliable services from PFISTERER have helped make energy infrastructure future-proof. Here is a selection of these projects.

Siemens
Deutsche Bahn
Saudi Electricity Company
Tennet
SBB
ÖBB

“As a cable-independent manufacturer of the CONNEX cable connection system, PFISTERER was able to offer us a fast-deploying solution in a very short time.”

Torsten Kröger, operation and service of 110 kV overhead line and cable networks of Schleswig-Holstein Netz AG

PFISTERER hat gezeigt, dass das Unternehmen auch ALS ANBIETER VON KOMPLETT-LÖSUNGEN HÖCHSTE ANFORDERUNGEN ERFÜLLT.

Juan Carlos Sanchez, Canary Islands Project Director von Red Eléctrica de España (REE)

„ALS WELTMARKTFÜHRER IN IHREM BEREICH, haben wir uns für PFISTERER für die 220 kV-AUSSTATTUNG FÜR DEN WINDPARK MORAY FIRTH ENTSCHIEDEN.

Peter Cooke, Technical Development Director, Volkerinfra.

References

Energy transmission
Substations
When building the new Klus substation in Solothurn, the focus was on the maximum possible personal safety.
Energy transmission
Offshore wind power
As part of the DolWin6 grid connection project, the DolWin kappa offshore platform had to be installed for the loss-free landward transmission of wind power. The particular challenge here was the…
Solar
Substations
Energy supplier KIUC on the island of Kauai was searching for a sustainable and safe way to improve its energy supply and reduce the consumption of fossil fuels.
Energy transmission
Overhead lines
In the densely populated Randstad in the Netherlands, with very low limit values for electromagnetic fields, TenneT's “Wintrack” project had to be realized with forward-looking and aesthetically…
Energy transmission
Underground cables
The geographical conditions of the low mountain range, characterized by striking differences in altitude and dense forests, posed specific challenges for the installation of underground cable systems.
Wind
Installation of a reliable and maintenance-free connection system for the transformer station and switchgear at the Q7 offshore wind farm, 23 km off the coast of the Netherlands.