Siemens
Deutsche Bahn
Saudi Electricity Company
Tennet
SBB
ÖBB

“As a cable-independent manufacturer of the CONNEX cable connection system, PFISTERER was able to offer us a fast-deploying solution in a very short time.”

Torsten Kröger, operation and service of 110 kV overhead line and cable networks of Schleswig-Holstein Netz AG

PFISTERER hat gezeigt, dass das Unternehmen auch ALS ANBIETER VON KOMPLETT-LÖSUNGEN HÖCHSTE ANFORDERUNGEN ERFÜLLT.

Juan Carlos Sanchez, Canary Islands Project Director von Red Eléctrica de España (REE)

„ALS WELTMARKTFÜHRER IN IHREM BEREICH, haben wir uns für PFISTERER für die 220 kV-AUSSTATTUNG FÜR DEN WINDPARK MORAY FIRTH ENTSCHIEDEN.

Peter Cooke, Technical Development Director, Volkerinfra.

References

Energy transmission
Substations
Certification of a plug-in connection system for environmentally friendly 420 kV clean air switchgear in order to minimize the environmental impact of energy transmission and offer a sustainable…
Energy transmission
Substations
Consolidated Edison, New York’s major energy supplier, was facing the challenge of developing a solution that could quickly restore power to millions of residents should a power transformer failure…
Energy transmission
Underground cables
As part of the conversion from the 30 kV medium-voltage level to the national 110 kV level, new lines and substations have been built in Gera. The general contractor Siemens needed a fast, robust and…
Offshore wind power
The connection of the 66 kV inter-array cabling for the offshore wind turbines presents the highest demands in terms of installation and operational safety.
Energy transmission
Overhead lines
Réseau de Transport d’Électricité (RTE), operator of the largest transmission grid in Europe, needed a tailor-made integration of silicone composite insulators into existing chain designs that were…
Energy transmission
Substations
When building the new Klus substation in Solothurn, the focus was on the maximum possible personal safety.