Installation of a bypass line at the Parndorf wind farm under tough conditions while the parallel system remains in operation.
The solution
The EST dry termination from PFISTERER enabled fast installation within just four days instead of several weeks.
Products used
EST termination with dry silicone insulation
Special features
The modular components mean the system can be pre-assembled on the floor, which significantly reduces installation time. The system is environmentally and installation-friendly.
Customer testimonials
“PFISTERER’s solution has proven to be extremely beneficial in practice. The time and cost savings are significant.”